| Brand Name: | Vigorous |
| Moq: | 1 Piece |
| Price: | Negotiable |
| Payment Terms: | T/T,L/C |
| Supply Ability: | 500–2000 pcs/month |
This precision transmission shaft is custom‑machined with premium titanium alloy as core raw material. Titanium alloy features excellent strength‑to‑weight ratio, outstanding corrosion resistance and reliable high‑temperature performance. Our comprehensive CNC turning and milling operations produce multi‑step diameters, external threads, keyways and transverse pin holes on this shaft component. Strict tolerance control ensures stable rotation performance and precise assembly for industrial transmission systems.
Apart from titanium alloy, we support diversified material selections for different operating conditions, including aluminum alloy, brass, carbon steel and stainless steel. All parts can be fully customized according to your drawings or samples.
| Item | Parameter |
|---|---|
| Main Material | Titanium Alloy Gr5 |
| Overall Length | 180 mm (estimated) |
| Maximum Outer Diameter | 32 mm (estimated) |
| Thread Specification | M16 (estimated) |
| Tolerance | ±0.005 mm |
| Surface Finish | Brushed / Fine Turning |
| Optional Materials | Titanium alloy Aluminum Brass Carbon steel Stainless steel |
Q1: Can you manufacture this titanium alloy shaft from my CAD drawing?
A1: Yes, we provide full custom service based on your drawings physical samples or technical specifications.
Q2: What alternative materials can be used for this same shaft geometry?
A2: Besides Titanium Gr5, we can process 7075 aluminum, brass, 4140 carbon steel and 316 stainless steel.
Q3: What dimensional tolerance can you achieve for titanium CNC shafts?
A3: Our standard tolerance reaches ±0.005 mm, tighter tolerances are achievable upon your request.
Q4: What surface treatments are available for titanium alloy shafts?
A4: We offer brushing, bead blasting, polishing and passivation for titanium shaft components.
Q5: How long is the lead time for custom titanium transmission shaft?
A5: Sample order lead time is 7‑10 working days, mass‑production lead time varies by order quantity.