| Brand Name: | Vigorous |
| Moq: | 1 Piece |
| Price: | Negotiable |
| Payment Terms: | T/T,L/C |
| Supply Ability: | 500–2000 pcs/month |
This complex multi‑port valve housing is completed by advanced 5‑axis CNC machining technology. Multi‑direction threaded bores, flanged mounting surfaces and irregular outer bosses are finished in one clamping setup. Sophisticated toolpath programming solves the difficulty of intersecting hole alignment and complex cavity forming, ensuring precise positional accuracy for each port and mounting hole.
Besides titanium alloy, we support diversified material processing to satisfy various fluid medium and pressure requirements, including aluminum alloy, brass, carbon steel and stainless steel. We can fully customize structure, port sizes and mounting layout according to your drawings.
| Item | Parameter |
|---|---|
| Main Material | Titanium Alloy Gr5 |
| Overall Dimension | 160*140*130 mm (estimated) |
| Main Port Thread | 2 inch internal thread (estimated) |
| Secondary Port Thread | 1.25 inch internal thread (estimated) |
| Tolerance | ±0.008 mm |
| Surface Finish | Brushed fine machining |
| Optional Materials | Titanium alloy Aluminum Brass Carbon steel Stainless steel |
Q1: Can you manufacture this complex titanium valve housing based on my 3D drawing?
A1: Yes, we accept custom production according to your CAD drawings, samples and technical specifications.
Q2: What alternative materials are available for this multi‑port valve housing structure?
A2: Apart from Titanium Gr5, we can process 7075 aluminum, brass, 4140 carbon steel and 316 stainless steel.
Q3: What tolerance can you achieve for 5‑axis CNC complex titanium housing?
A3: Our standard tolerance reaches ±0.008 mm, tighter tolerance can be achieved upon your requirement.
Q4: What surface treatments can you apply for titanium alloy fluid housing parts?
A4: We offer brushing, bead blasting, polishing and passivation treatment for titanium components.
Q5: What is the lead time for custom 5‑axis machined titanium valve housing?
A5: Sample lead time is 10‑14 working days, mass‑production lead time changes with order quantity.